Adensa DigitalSupply-chain operations

Investigation Workspace

Situation, decision support, evidence and workflow state for one operational exception.

EXC-900002 — Shipment Delay

Shipment SHP-900002 · Order ORD-900001 · Fixture Customer

HighNo system recovery available
  1. DetectedCompleted
  2. Manual resolutionCurrent
  3. OutcomeUpcoming

Situation & Impact

Fixture exception: five days late

ExceptionEXC-900002 · HighShipment statusIn Transit
RouteRotterdam → HamburgMode / CarrierSea · CAR-900001
Route detailRotterdam → HamburgPlanned departure2026-09-12
Estimated arrival2026-09-20Required delivery2026-09-15
Order / CustomerORD-900001 · Fixture CustomerException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003484 — Air565022182.75—
OPT-003486 — Rail4350103667.61—
Why this recommendation
FactorWeightOPT-003485 (Road)OPT-003484 (Air)OPT-003486 (Rail)
Cost fit0.2546 (11.5)35 (8.75)48 (12)
Transit fit0.393.75 (28.12)100 (30)57.86 (17.36)
Risk fit0.2594 (23.5)100 (25)89 (22.25)
Priority fit0.2100 (20)95 (19)80 (16)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003484 (Air) is stronger on Transit fit, Risk fit.
  • OPT-003486 (Rail) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (0.37 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Fixture exception: five days late

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 3 feasible — 0 infeasible

  3. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-09-20 still misses required delivery 2026-09-15 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (3 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003485Road150—
OPT-003484Air900Higher
OPT-003486Rail42Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: No system recovery available

No system recovery action exists for this exception.

No system recovery exists — resolution requires human intervention outside the system.