EXC-001529 — Delivery Delay

Shipment SHP-SIM-0001 · Order ORD-00001 · EuroTech Distribution AG

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-07-28 is later than required delivery date 2026-07-22.

ExceptionEXC-001529 · HighShipment statusIn Transit
RouteShanghai → FrankfurtMode / CarrierSea · CAR-001
Route detailShanghai → FrankfurtPlanned departure2026-07-18
Estimated arrival2026-07-28Required delivery2026-07-22
Order / CustomerORD-00001 · EuroTech Distribution AGException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003479 — Road430045477.53—
OPT-003480 — Rail4200105961.26—
Why this recommendation
FactorWeightOPT-003478 (Air)OPT-003479 (Road)OPT-003480 (Rail)
Cost fit0.2535 (8.75)49 (12.25)51 (12.75)
Transit fit0.3100 (30)93.75 (28.12)57.86 (17.36)
Risk fit0.2581 (20.25)68.6 (17.15)60.6 (15.15)
Priority fit0.295 (19)100 (20)80 (16)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003479 (Road) is stronger on Cost fit, Priority fit.
  • OPT-003480 (Rail) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (0.47 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-07-28 is later than required delivery date 2026-07-22.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 3 feasible — 0 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000829 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €5,500.00. Estimated transit: 2.0 days. Risk score: 44.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-07-28 still misses required delivery 2026-07-22 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (3 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003478Air810—
OPT-003479Road135Lower
OPT-003480Rail37.8Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000829 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.