EXC-001525 — Delivery Delay

Shipment SHP-04977 · Order ORD-04977 · Benelux Smart Devices

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-04-15 is later than required delivery date 2026-04-08.

ExceptionEXC-001525 · HighShipment statusDelivered
RouteSeoul → HamburgMode / CarrierRail · CAR-005
Route detailSeoul → HamburgPlanned departure2026-03-28
Estimated arrival2026-04-15Required delivery2026-04-08
Order / CustomerORD-04977 · Benelux Smart DevicesException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003469 — Air3401.324485.99—
Why this recommendation
FactorWeightOPT-003470 (Road)OPT-003469 (Air)
Cost fit0.2588.31 (22.08)66.97 (16.74)
Transit fit0.393.75 (28.12)100 (30)
Risk fit0.2568.6 (17.15)81 (20.25)
Priority fit0.2100 (20)95 (19)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003469 (Air) is stronger on Transit fit, Risk fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.36 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-04-15 is later than required delivery date 2026-04-08.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000826 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,201.30. Estimated transit: 4.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-04-15 still misses required delivery 2026-04-08 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003470Road18.74—
OPT-003469Air112.43Higher

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000826 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.