Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-04-15 is later than required delivery date 2026-04-08.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-04-15 is later than required delivery date 2026-04-08.
| Exception | EXC-001525 · High | Shipment status | Delivered |
|---|---|---|---|
| Route | Seoul → Hamburg | Mode / Carrier | Rail · CAR-005 |
| Route detail | Seoul → Hamburg | Planned departure | 2026-03-28 |
| Estimated arrival | 2026-04-15 | Required delivery | 2026-04-08 |
| Order / Customer | ORD-04977 · Benelux Smart Devices | Exception status | Open |
Based on the separation between this option's score (87.35) and the next-best alternative's score (85.99) - a gap of 1.36 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-003469 — Air | 3401.3 | 2 | 44 | 85.99 | — |
| Factor | Weight | OPT-003470 (Road) | OPT-003469 (Air) |
|---|---|---|---|
| Cost fit | 0.25 | 88.31 (22.08) | 66.97 (16.74) |
| Transit fit | 0.3 | 93.75 (28.12) | 100 (30) |
| Risk fit | 0.25 | 68.6 (17.15) | 81 (20.25) |
| Priority fit | 0.2 | 100 (20) | 95 (19) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.36 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-04-15 is later than required delivery date 2026-04-08.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 2 feasible — 1 infeasible
Recommendation generated — Adensa decision engine
ACT-000826 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,201.30. Estimated transit: 4.0 days. Risk score: 54.0.
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-04-15 still misses required delivery 2026-04-08 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-003470 | Road | 18.74 | — |
| OPT-003469 | Air | 112.43 | Higher |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Decision required
Recovery action ACT-000826 is awaiting a planner approval or rejection decision.