EXC-001474 — Delivery Delay

Shipment SHP-04768 · Order ORD-04768 · Benelux Smart Devices

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-03-11 is later than required delivery date 2026-02-23.

ExceptionEXC-001474 · HighShipment statusDelayed
RouteSeoul → ParisMode / CarrierSea · CAR-005
Route detailSeoul → ParisPlanned departure2026-02-09
Estimated arrival2026-03-11Required delivery2026-02-23
Order / CustomerORD-04768 · Benelux Smart DevicesException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003361 — Air4251.2524481.74—
OPT-003363 — Rail2951.25105967.46—
Why this recommendation
FactorWeightOPT-003362 (Road)OPT-003361 (Air)OPT-003363 (Rail)
Cost fit0.2573.97 (18.49)49.98 (12.49)75.81 (18.95)
Transit fit0.393.75 (28.12)100 (30)57.86 (17.36)
Risk fit0.2568.6 (17.15)81 (20.25)60.6 (15.15)
Priority fit0.2100 (20)95 (19)80 (16)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003361 (Air) is stronger on Transit fit, Risk fit.
  • OPT-003363 (Rail) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (2.03 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-03-11 is later than required delivery date 2026-02-23.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 3 feasible — 0 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000802 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €3,051.25. Estimated transit: 4.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-03-11 still misses required delivery 2026-02-23 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (3 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003362Road42.05—
OPT-003361Air252.28Higher
OPT-003363Rail11.77Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000802 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.