Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-03-29 is later than required delivery date 2026-03-27.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-03-29 is later than required delivery date 2026-03-27.
| Exception | EXC-001455 · High | Shipment status | In Transit |
|---|---|---|---|
| Route | Seoul → Paris | Mode / Carrier | Rail · CAR-004 |
| Route detail | Seoul → Paris | Planned departure | 2026-03-12 |
| Estimated arrival | 2026-03-29 | Required delivery | 2026-03-27 |
| Order / Customer | ORD-04706 · Medion Systems Europe | Exception status | Open |
Based on the separation between this option's score (88.44) and the next-best alternative's score (86.56) - a gap of 1.88 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-003323 — Road | 1912.55 | 4 | 54 | 86.56 | — |
| Factor | Weight | OPT-003322 (Air) | OPT-003323 (Road) |
|---|---|---|---|
| Cost fit | 0.25 | 72.75 (18.19) | 93.12 (23.28) |
| Transit fit | 0.3 | 100 (30) | 93.75 (28.12) |
| Risk fit | 0.25 | 81 (20.25) | 68.6 (17.15) |
| Priority fit | 0.2 | 100 (20) | 90 (18) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.88 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-03-29 is later than required delivery date 2026-03-27.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 2 feasible — 1 infeasible
Recommendation generated — Adensa decision engine
ACT-000791 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €3,112.55. Estimated transit: 2.0 days. Risk score: 44.0.
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-03-29 still misses required delivery 2026-03-27 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-003322 | Air | 635.85 | — |
| OPT-003323 | Road | 105.98 | Lower |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Decision required
Recovery action ACT-000791 is awaiting a planner approval or rejection decision.