Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-08-08 is later than required delivery date 2026-08-02.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-08-08 is later than required delivery date 2026-08-02.
| Exception | EXC-001453 · High | Shipment status | In Transit |
|---|---|---|---|
| Route | Shanghai → Hamburg | Mode / Carrier | Sea · CAR-001 |
| Route detail | Shanghai → Hamburg | Planned departure | 2026-07-15 |
| Estimated arrival | 2026-08-08 | Required delivery | 2026-08-02 |
| Order / Customer | ORD-04700 · Milano Device Group | Exception status | Open |
Based on the separation between this option's score (86.93) and the next-best alternative's score (82.49) - a gap of 4.44 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-003316 — Air | 3502.72 | 2 | 44 | 82.49 | — |
| OPT-003318 — Rail | 2202.72 | 10 | 59 | 72.58 | — |
| Factor | Weight | OPT-003317 (Road) | OPT-003316 (Air) | OPT-003318 (Rail) |
|---|---|---|---|---|
| Cost fit | 0.25 | 86.62 (21.66) | 64.95 (16.24) | 88.29 (22.07) |
| Transit fit | 0.3 | 93.75 (28.12) | 100 (30) | 57.86 (17.36) |
| Risk fit | 0.25 | 68.6 (17.15) | 81 (20.25) | 60.6 (15.15) |
| Priority fit | 0.2 | 100 (20) | 80 (16) | 90 (18) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (4.44 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-08-08 is later than required delivery date 2026-08-02.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 3 feasible — 0 infeasible
Recommendation generated — Adensa decision engine
ACT-000789 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,302.72. Estimated transit: 4.0 days. Risk score: 54.0.
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-08-08 still misses required delivery 2026-08-02 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-003317 | Road | 88.49 | — |
| OPT-003316 | Air | 530.97 | Higher |
| OPT-003318 | Rail | 24.78 | Lower |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Decision required
Recovery action ACT-000789 is awaiting a planner approval or rejection decision.