EXC-001441 — Delivery Delay

Shipment SHP-04664 · Order ORD-04664 · EuroTech Distribution AG

HighExecuted — still open
  1. DetectedCompleted
  2. Manual resolutionCurrent
  3. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-08-06 is later than required delivery date 2026-08-04.

ExceptionEXC-001441 · HighShipment statusIn Transit
RouteSeoul → HamburgMode / CarrierAir · CAR-001
Route detailSeoul → HamburgPlanned departure2026-08-02
Estimated arrival2026-08-05Required delivery2026-08-04
Order / CustomerORD-04664 · EuroTech Distribution AGException statusOpen

Decision Support

No comparable alternatives were evaluated.

Why this recommendation
FactorWeightOPT-003289 (Air)
Cost fit0.2576.08 (19.02)
Transit fit0.3100 (30)
Risk fit0.2581 (20.25)
Priority fit0.2100 (20)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

Confidence basis: High confidence reflects a single feasible recovery option, not a probability of success.

Operational History

  1. 2026-08-02 08:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-08-06 is later than required delivery date 2026-08-04.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 1 feasible — 2 infeasible

  3. 2026-08-02 12:00:00

    Recommendation generated — Adensa decision engine

    ACT-000784 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €2,935.43. Estimated transit: 2.0 days. Risk score: 44.0.

  4. 2026-08-02 12:00:00

    Recovery approved — J. Lindqvist

    ACT-000784 by J. Lindqvist

  5. 2026-08-03 00:00:00

    Recovery executed — J. Lindqvist

    ACT-000784 — shipment recovered through the system recovery workflow

  6. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-08-05 still misses required delivery 2026-08-04 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (1 option) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003289Air189.48—

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Executed — still open

Recovery executed, but estimated arrival 2026-08-05 remains later than required delivery 2026-08-04. Exception remains open after recovery execution.

The recovery action was executed; the exception remains open and requires follow-up.