Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-09-25 is later than required delivery date 2026-09-16.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-09-25 is later than required delivery date 2026-09-16.
| Exception | EXC-001428 · High | Shipment status | In Transit |
|---|---|---|---|
| Route | Tokyo → Paris | Mode / Carrier | Sea · CAR-006 |
| Route detail | Tokyo → Paris | Planned departure | 2026-08-31 |
| Estimated arrival | 2026-09-25 | Required delivery | 2026-09-16 |
| Order / Customer | ORD-04617 · Alpine Digital Solutions | Exception status | Open |
Based on the separation between this option's score (89.44) and the next-best alternative's score (87.27) - a gap of 2.17 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-003259 — Air | 3645.35 | 2 | 34 | 87.27 | — |
| OPT-003261 — Rail | 2345.35 | 10 | 49 | 73.83 | — |
| Factor | Weight | OPT-003260 (Road) | OPT-003259 (Air) | OPT-003261 (Rail) |
|---|---|---|---|---|
| Cost fit | 0.25 | 84.24 (21.06) | 62.09 (15.52) | 85.91 (21.48) |
| Transit fit | 0.3 | 93.75 (28.12) | 100 (30) | 57.86 (17.36) |
| Risk fit | 0.25 | 81 (20.25) | 91 (22.75) | 76 (19) |
| Priority fit | 0.2 | 100 (20) | 95 (19) | 80 (16) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (2.17 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-09-25 is later than required delivery date 2026-09-16.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 3 feasible — 0 infeasible
Recommendation generated — Adensa decision engine
ACT-000775 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,445.35. Estimated transit: 4.0 days. Risk score: 44.0.
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-09-25 still misses required delivery 2026-09-16 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-003260 | Road | 42.75 | — |
| OPT-003259 | Air | 256.51 | Higher |
| OPT-003261 | Rail | 11.97 | Lower |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Decision required
Recovery action ACT-000775 is awaiting a planner approval or rejection decision.