EXC-001416 — Delivery Delay

Shipment SHP-04585 · Order ORD-04585 · Nordic Electronics GmbH

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-09-14 is later than required delivery date 2026-09-01.

ExceptionEXC-001416 · HighShipment statusDelivered
RouteShanghai → FrankfurtMode / CarrierSea · CAR-003
Route detailShanghai → FrankfurtPlanned departure2026-08-19
Estimated arrival2026-09-14Required delivery2026-09-01
Order / CustomerORD-04585 · Nordic Electronics GmbHException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003232 — Air4152.8524482.24—
OPT-003234 — Rail2852.85105967.87—
Why this recommendation
FactorWeightOPT-003233 (Road)OPT-003232 (Air)OPT-003234 (Rail)
Cost fit0.2575.79 (18.95)51.94 (12.99)77.45 (19.36)
Transit fit0.393.75 (28.12)100 (30)57.86 (17.36)
Risk fit0.2568.6 (17.15)81 (20.25)60.6 (15.15)
Priority fit0.2100 (20)95 (19)80 (16)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003232 (Air) is stronger on Transit fit, Risk fit.
  • OPT-003234 (Rail) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.98 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-09-14 is later than required delivery date 2026-09-01.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 3 feasible — 0 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000770 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,952.85. Estimated transit: 4.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-09-14 still misses required delivery 2026-09-01 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (3 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003233Road78.94—
OPT-003232Air473.65Higher
OPT-003234Rail22.1Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000770 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.