EXC-001378 — Delivery Delay

Shipment SHP-04479 · Order ORD-04479 · Iberia Tech Retail

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-04-04 is later than required delivery date 2026-03-27.

ExceptionEXC-001378 · HighShipment statusDelayed
RouteSeoul → MilanMode / CarrierRail · CAR-001
Route detailSeoul → MilanPlanned departure2026-03-12
Estimated arrival2026-04-04Required delivery2026-03-27
Order / CustomerORD-04479 · Iberia Tech RetailException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003142 — Air367324484.63—
Why this recommendation
FactorWeightOPT-003143 (Road)OPT-003142 (Air)
Cost fit0.2583.78 (20.95)61.54 (15.38)
Transit fit0.393.75 (28.12)100 (30)
Risk fit0.2568.6 (17.15)81 (20.25)
Priority fit0.2100 (20)95 (19)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003142 (Air) is stronger on Transit fit, Risk fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.59 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-04-04 is later than required delivery date 2026-03-27.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000750 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,473.00. Estimated transit: 4.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-04-04 still misses required delivery 2026-03-27 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003143Road76.76—
OPT-003142Air460.54Higher

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000750 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.