Adensa DigitalSupply-chain operations

Investigation Workspace

Situation, decision support, evidence and workflow state for one operational exception.

EXC-001361 — Delivery Delay

Shipment SHP-04420 · Order ORD-04420 · Iberia Tech Retail

MediumDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-02-26 is later than required delivery date 2026-02-23.

ExceptionEXC-001361 · MediumShipment statusDelivered
RouteSeoul → RotterdamMode / CarrierRail · CAR-002
Route detailSeoul → RotterdamPlanned departure2026-02-08
Estimated arrival2026-02-26Required delivery2026-02-23
Order / CustomerORD-04420 · Iberia Tech RetailException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003100 — Air2725.9524489.14—
Why this recommendation
FactorWeightOPT-003101 (Road)OPT-003100 (Air)
Cost fit0.2599.57 (24.89)79.57 (19.89)
Transit fit0.393.75 (28.12)100 (30)
Risk fit0.2568.6 (17.15)81 (20.25)
Priority fit0.2100 (20)95 (19)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003100 (Air) is stronger on Transit fit, Risk fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.03 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    Medium severity — Estimated arrival 2026-02-26 is later than required delivery date 2026-02-23.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000740 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €1,525.95. Estimated transit: 4.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-02-26 still misses required delivery 2026-02-23 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003101Road105.59—
OPT-003100Air633.54Higher

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000740 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.