EXC-001351 — Delivery Delay

Shipment SHP-04398 · Order ORD-04398 · Rhein Digital Commerce

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-06-22 is later than required delivery date 2026-06-20.

ExceptionEXC-001351 · HighShipment statusDelivered
RouteShenzhen → RotterdamMode / CarrierRail · CAR-002
Route detailShenzhen → RotterdamPlanned departure2026-06-04
Estimated arrival2026-06-22Required delivery2026-06-20
Order / CustomerORD-04398 · Rhein Digital CommerceException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-003083 — Road2566.8545483.83—
Why this recommendation
FactorWeightOPT-003082 (Air)OPT-003083 (Road)
Cost fit0.2559.66 (14.92)82.22 (20.55)
Transit fit0.3100 (30)93.75 (28.12)
Risk fit0.2581 (20.25)68.6 (17.15)
Priority fit0.2100 (20)90 (18)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-003083 (Road) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.34 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-06-22 is later than required delivery date 2026-06-20.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000734 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €3,766.85. Estimated transit: 2.0 days. Risk score: 44.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-06-22 still misses required delivery 2026-06-20 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-003082Air2002.62—
OPT-003083Road333.77Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000734 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.