Exception detected — Adensa operational pipeline
Critical severity — Estimated arrival 2026-05-10 is later than required delivery date 2026-05-07.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-05-10 is later than required delivery date 2026-05-07.
| Exception | EXC-001094 · Critical | Shipment status | Delayed |
|---|---|---|---|
| Route | Shenzhen → Frankfurt | Mode / Carrier | Air · CAR-001 |
| Route detail | Shenzhen → Frankfurt | Planned departure | 2026-05-05 |
| Estimated arrival | 2026-05-08 | Required delivery | 2026-05-07 |
| Order / Customer | ORD-03560 · EuroTech Distribution AG | Exception status | Open |
This is the only feasible recovery option identified by the current rules.
No comparable alternatives were evaluated.
| Factor | Weight | OPT-002506 (Air) |
|---|---|---|
| Cost fit | 0.25 | 58.58 (14.65) |
| Transit fit | 0.3 | 100 (30) |
| Risk fit | 0.25 | 68.6 (17.15) |
| Priority fit | 0.2 | 100 (20) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: High confidence reflects a single feasible recovery option, not a probability of success.
Exception detected — Adensa operational pipeline
Critical severity — Estimated arrival 2026-05-10 is later than required delivery date 2026-05-07.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 1 feasible — 2 infeasible
Recommendation generated — Adensa decision engine
ACT-000608 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €3,820.82. Estimated transit: 2.0 days. Risk score: 54.0.
Recovery approved — A. Rivera
ACT-000608 by A. Rivera
Recovery executed — A. Rivera
ACT-000608 — shipment recovered through the system recovery workflow
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-05-08 still misses required delivery 2026-05-07 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-002506 | Air | 598.7 | — |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Executed — still open
Recovery executed, but estimated arrival 2026-05-08 remains later than required delivery 2026-05-07. Exception remains open after recovery execution.