Exception detected — Adensa operational pipeline
Medium severity — Estimated arrival 2026-03-25 is later than required delivery date 2026-03-22.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-03-25 is later than required delivery date 2026-03-22.
| Exception | EXC-001071 · Medium | Shipment status | In Transit |
|---|---|---|---|
| Route | Shanghai → Milan | Mode / Carrier | Air · CAR-001 |
| Route detail | Shanghai → Milan | Planned departure | 2026-03-20 |
| Estimated arrival | 2026-03-23 | Required delivery | 2026-03-22 |
| Order / Customer | ORD-03488 · Benelux Smart Devices | Exception status | Open |
This is the only feasible recovery option identified by the current rules.
No comparable alternatives were evaluated.
| Factor | Weight | OPT-002458 (Air) |
|---|---|---|
| Cost fit | 0.25 | 82.16 (20.54) |
| Transit fit | 0.3 | 100 (30) |
| Risk fit | 0.25 | 81 (20.25) |
| Priority fit | 0.2 | 95 (19) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: High confidence reflects a single feasible recovery option, not a probability of success.
Exception detected — Adensa operational pipeline
Medium severity — Estimated arrival 2026-03-25 is later than required delivery date 2026-03-22.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 1 feasible — 2 infeasible
Recommendation generated — Adensa decision engine
ACT-000595 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €2,570.45. Estimated transit: 2.0 days. Risk score: 44.0.
Recovery approved — M. Okafor
ACT-000595 by M. Okafor
Recovery executed — M. Okafor
ACT-000595 — shipment recovered through the system recovery workflow
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-03-23 still misses required delivery 2026-03-22 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-002458 | Air | 265.43 | — |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Executed — still open
Recovery executed, but estimated arrival 2026-03-23 remains later than required delivery 2026-03-22. Exception remains open after recovery execution.