Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-04-02 is later than required delivery date 2026-04-01.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-04-02 is later than required delivery date 2026-04-01.
| Exception | EXC-000850 · High | Shipment status | Delivered |
|---|---|---|---|
| Route | Shenzhen → Hamburg | Mode / Carrier | Road · CAR-001 |
| Route detail | Shenzhen → Hamburg | Planned departure | 2026-03-30 |
| Estimated arrival | 2026-04-04 | Required delivery | 2026-04-01 |
| Order / Customer | ORD-02809 · Alpine Digital Solutions | Exception status | Open |
This is the only feasible recovery option identified by the current rules.
No comparable alternatives were evaluated.
| Factor | Weight | OPT-001951 (Road) |
|---|---|---|
| Cost fit | 0.25 | 93.23 (23.31) |
| Transit fit | 0.3 | 93.75 (28.12) |
| Risk fit | 0.25 | 68.6 (17.15) |
| Priority fit | 0.2 | 90 (18) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: High confidence reflects a single feasible recovery option, not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-04-02 is later than required delivery date 2026-04-01.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 1 feasible — 2 infeasible
Recommendation generated — Adensa decision engine
ACT-000481 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €1,906.30. Estimated transit: 4.0 days. Risk score: 54.0.
Recovery approved — A. Rivera
ACT-000481 by A. Rivera
Recovery executed — A. Rivera
ACT-000481 — shipment recovered through the system recovery workflow
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-04-04 still misses required delivery 2026-04-01 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-001951 | Road | 136.39 | — |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Executed — still open
Recovery executed, but estimated arrival 2026-04-04 remains later than required delivery 2026-04-01. Exception remains open after recovery execution.