EXC-000826 — Delivery Delay

Shipment SHP-02749 · Order ORD-02749 · Benelux Smart Devices

MediumAwaiting execution
  1. DetectedCompleted
  2. DecisionCompleted
  3. ExecutionCurrent
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-09-10 is later than required delivery date 2026-09-06.

ExceptionEXC-000826 · MediumShipment statusIn Transit
RouteSingapore → MilanMode / CarrierRail · CAR-006
Route detailSingapore → MilanPlanned departure2026-08-29
Estimated arrival2026-09-10Required delivery2026-09-06
Order / CustomerORD-02749 · Benelux Smart DevicesException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-001891 — Air2812.6824488.78—
Why this recommendation
FactorWeightOPT-001892 (Road)OPT-001891 (Air)
Cost fit0.2598.12 (24.53)78.12 (19.53)
Transit fit0.393.75 (28.12)100 (30)
Risk fit0.2568.6 (17.15)81 (20.25)
Priority fit0.2100 (20)95 (19)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-001891 (Air) is stronger on Transit fit, Risk fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.03 points). It is not a probability of success.

Operational History

  1. 2026-08-29 08:00:00

    Exception detected — Adensa operational pipeline

    Medium severity — Estimated arrival 2026-09-10 is later than required delivery date 2026-09-06.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. 2026-09-10 12:00:00

    Recommendation generated — Adensa decision engine

    ACT-000465 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €1,612.67. Estimated transit: 4.0 days. Risk score: 54.0.

  4. 2026-09-10 12:00:00

    Recovery approved — A. Rivera

    ACT-000465 by A. Rivera

  5. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-09-10 still misses required delivery 2026-09-06 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-001892Road120.07—
OPT-001891Air720.44Higher

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Awaiting execution

Recovery action ACT-000465 has been approved and is ready for execution.

The approved recovery action is waiting to be executed by operations.