Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-09-28 is later than required delivery date 2026-09-13.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-09-28 is later than required delivery date 2026-09-13.
| Exception | EXC-000784 · High | Shipment status | Delayed |
|---|---|---|---|
| Route | Shanghai → Hamburg | Mode / Carrier | Sea · CAR-003 |
| Route detail | Shanghai → Hamburg | Planned departure | 2026-08-30 |
| Estimated arrival | 2026-09-28 | Required delivery | 2026-09-13 |
| Order / Customer | ORD-02626 · EuroTech Distribution AG | Exception status | Open |
Based on the separation between this option's score (85.47) and the next-best alternative's score (82.84) - a gap of 2.63 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-001786 — Air | 4281.15 | 2 | 39 | 82.84 | — |
| OPT-001788 — Rail | 2981.15 | 10 | 54 | 69.34 | — |
| Factor | Weight | OPT-001787 (Road) | OPT-001786 (Air) | OPT-001788 (Rail) |
|---|---|---|---|---|
| Cost fit | 0.25 | 73.38 (18.34) | 49.38 (12.34) | 75.31 (18.83) |
| Transit fit | 0.3 | 93.75 (28.12) | 100 (30) | 57.86 (17.36) |
| Risk fit | 0.25 | 76 (19) | 86 (21.5) | 68.6 (17.15) |
| Priority fit | 0.2 | 100 (20) | 95 (19) | 80 (16) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (2.63 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-09-28 is later than required delivery date 2026-09-13.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 3 feasible — 0 infeasible
Recommendation generated — Adensa decision engine
ACT-000437 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €3,081.15. Estimated transit: 4.0 days. Risk score: 49.0.
Recovery approved — K. Stein
ACT-000437 by K. Stein
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-09-28 still misses required delivery 2026-09-13 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-001787 | Road | 49.19 | — |
| OPT-001786 | Air | 295.15 | Higher |
| OPT-001788 | Rail | 13.77 | Lower |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Awaiting execution
Recovery action ACT-000437 has been approved and is ready for execution.