EXC-000517 — Delivery Delay

Shipment SHP-01751 · Order ORD-01751 · Iberia Tech Retail

CriticalDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-09-10 is later than required delivery date 2026-09-02.

ExceptionEXC-000517 · CriticalShipment statusIn Transit
RouteShenzhen → RotterdamMode / CarrierRail · CAR-001
Route detailShenzhen → RotterdamPlanned departure2026-08-21
Estimated arrival2026-09-10Required delivery2026-09-02
Order / CustomerORD-01751 · Iberia Tech RetailException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-001160 — Road2984.0546478.09—
Why this recommendation
FactorWeightOPT-001159 (Air)OPT-001160 (Road)
Cost fit0.2551.32 (12.83)75.27 (18.82)
Transit fit0.3100 (30)93.75 (28.12)
Risk fit0.2568.6 (17.15)52.6 (13.15)
Priority fit0.2100 (20)90 (18)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-001160 (Road) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.89 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    Critical severity — Estimated arrival 2026-09-10 is later than required delivery date 2026-09-02.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000293 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €4,184.05. Estimated transit: 2.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-09-10 still misses required delivery 2026-09-02 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-001159Air317.12—
OPT-001160Road52.85Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000293 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.