EXC-000513 — Delivery Delay

Shipment SHP-01733 · Order ORD-01733 · Paris Connected Systems

HighDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-09-08 is later than required delivery date 2026-08-27.

ExceptionEXC-000513 · HighShipment statusDelivered
RouteTokyo → RotterdamMode / CarrierRail · CAR-001
Route detailTokyo → RotterdamPlanned departure2026-08-20
Estimated arrival2026-09-08Required delivery2026-08-27
Order / CustomerORD-01733 · Paris Connected SystemsException statusOpen

Decision Support

No comparable alternatives were evaluated.

Why this recommendation
FactorWeightOPT-001150 (Air)
Cost fit0.2557.29 (14.32)
Transit fit0.3100 (30)
Risk fit0.2581 (20.25)
Priority fit0.295 (19)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

Confidence basis: High confidence reflects a single feasible recovery option, not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    High severity — Estimated arrival 2026-09-08 is later than required delivery date 2026-08-27.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 1 feasible — 2 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000291 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €3,885.65. Estimated transit: 2.0 days. Risk score: 44.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-09-08 still misses required delivery 2026-08-27 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (1 option) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-001150Air97.91—

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000291 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.