Adensa DigitalSupply-chain operations

Investigation Workspace

Situation, decision support, evidence and workflow state for one operational exception.

EXC-000355 — Delivery Delay

Shipment SHP-01262 · Order ORD-01262 · Central Europe Components

CriticalDecision required
  1. DetectedCompleted
  2. DecisionCurrent
  3. ExecutionUpcoming
  4. OutcomeUpcoming

Situation & Impact

Estimated arrival 2026-09-23 is later than required delivery date 2026-09-02.

ExceptionEXC-000355 · CriticalShipment statusIn Transit
RouteShenzhen → RotterdamMode / CarrierSea · CAR-005
Route detailShenzhen → RotterdamPlanned departure2026-08-19
Estimated arrival2026-09-23Required delivery2026-09-02
Order / CustomerORD-01262 · Central Europe ComponentsException statusOpen

Decision Support

AlternativeCostTransit (days)RiskDecision scoreConfidence
OPT-000800 — Road3732.8846474.36—
Why this recommendation
FactorWeightOPT-000799 (Air)OPT-000800 (Road)
Cost fit0.2536.34 (9.09)60.34 (15.09)
Transit fit0.3100 (30)93.75 (28.12)
Risk fit0.2568.6 (17.15)52.6 (13.15)
Priority fit0.2100 (20)90 (18)

Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.

  • OPT-000800 (Road) is stronger on Cost fit.

Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.88 points). It is not a probability of success.

Operational History

  1. 2026-09-10 12:00:00

    Exception detected — Adensa operational pipeline

    Critical severity — Estimated arrival 2026-09-23 is later than required delivery date 2026-09-02.

  2. —

    Recovery options evaluated — Adensa recovery engine

    3 options assessed; 2 feasible — 1 infeasible

  3. —

    Recommendation generated — Adensa decision engine

    ACT-000201 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €4,932.88. Estimated transit: 2.0 days. Risk score: 54.0.

  4. —

    Exception still open — Adensa operational pipeline

    Current status: Open — estimated arrival 2026-09-23 still misses required delivery 2026-09-02 — monitored until recovery is recorded

Sustainability Impact

Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.

Emissions estimates (2 options) & methodology
OptionModeEstimated CO₂e (kg)vs Recommended
OPT-000799Air383.12—
OPT-000800Road63.85Lower

Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.

Workflow Action

Current state: Decision required

Recovery action ACT-000201 is awaiting a planner approval or rejection decision.

Review the recommendation and record the approval or rejection decision.