Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-09-19 is later than required delivery date 2026-09-09.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-09-19 is later than required delivery date 2026-09-09.
| Exception | EXC-000070 · High | Shipment status | Delayed |
|---|---|---|---|
| Route | Seoul → Rotterdam | Mode / Carrier | Rail · CAR-004 |
| Route detail | Seoul → Rotterdam | Planned departure | 2026-08-31 |
| Estimated arrival | 2026-09-19 | Required delivery | 2026-09-09 |
| Order / Customer | ORD-00234 · Medion Systems Europe | Exception status | Open |
Based on the separation between this option's score (84.57) and the next-best alternative's score (82.65) - a gap of 1.92 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-000148 — Air | 4069.85 | 2 | 44 | 82.65 | — |
| Factor | Weight | OPT-000149 (Road) | OPT-000148 (Air) |
|---|---|---|---|
| Cost fit | 0.25 | 77.17 (19.29) | 53.6 (13.4) |
| Transit fit | 0.3 | 93.75 (28.12) | 100 (30) |
| Risk fit | 0.25 | 68.6 (17.15) | 81 (20.25) |
| Priority fit | 0.2 | 100 (20) | 95 (19) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (1.92 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
High severity — Estimated arrival 2026-09-19 is later than required delivery date 2026-09-09.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 2 feasible — 1 infeasible
Recommendation generated — Adensa decision engine
ACT-000036 — Recommended recovery: switch shipment to Road using carrier CAR-001. Estimated cost: €2,869.85. Estimated transit: 4.0 days. Risk score: 54.0.
Recovery approved — M. Okafor
ACT-000036 by M. Okafor
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-09-19 still misses required delivery 2026-09-09 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-000149 | Road | 165.2 | — |
| OPT-000148 | Air | 991.22 | Higher |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Awaiting execution
Recovery action ACT-000036 has been approved and is ready for execution.