Exception detected — Adensa operational pipeline
Critical severity — Estimated arrival 2026-07-09 is later than required delivery date 2026-07-06.
Situation, decision support, evidence and workflow state for one operational exception.
Estimated arrival 2026-07-09 is later than required delivery date 2026-07-06.
| Exception | EXC-000008 · Critical | Shipment status | Delivered |
|---|---|---|---|
| Route | Tokyo → Frankfurt | Mode / Carrier | Rail · CAR-001 |
| Route detail | Tokyo → Frankfurt | Planned departure | 2026-06-21 |
| Estimated arrival | 2026-07-09 | Required delivery | 2026-07-06 |
| Order / Customer | ORD-00027 · EuroTech Distribution AG | Exception status | Open |
Based on the separation between this option's score (82.21) and the next-best alternative's score (79.95) - a gap of 2.26 points.
| Alternative | Cost | Transit (days) | Risk | Decision score | Confidence |
|---|---|---|---|---|---|
| OPT-000017 — Road | 2537.82 | 4 | 64 | 79.95 | — |
| Factor | Weight | OPT-000016 (Air) | OPT-000017 (Road) |
|---|---|---|---|
| Cost fit | 0.25 | 60.24 (15.06) | 82.7 (20.68) |
| Transit fit | 0.3 | 100 (30) | 93.75 (28.12) |
| Risk fit | 0.25 | 68.6 (17.15) | 52.6 (13.15) |
| Priority fit | 0.2 | 100 (20) | 90 (18) |
Each cell: factor score (weighted contribution to the decision score). Weights are policy configuration — unchanged by this view.
Confidence basis: Derived from the separation between the recommended option's score and the next-best alternative (2.26 points). It is not a probability of success.
Exception detected — Adensa operational pipeline
Critical severity — Estimated arrival 2026-07-09 is later than required delivery date 2026-07-06.
Recovery options evaluated — Adensa recovery engine
3 options assessed; 2 feasible — 1 infeasible
Recommendation generated — Adensa decision engine
ACT-000005 — Recommended recovery: switch shipment to Air using carrier CAR-001. Estimated cost: €3,737.82. Estimated transit: 2.0 days. Risk score: 54.0.
Recovery approved — A. Real Planner
ACT-000005 by A. Real Planner
Exception still open — Adensa operational pipeline
Current status: Open — estimated arrival 2026-07-09 still misses required delivery 2026-07-06 — monitored until recovery is recorded
Informational only — estimated emissions (kg CO₂e) never affect the recovery recommendation. Prototype sustainability estimate based on persisted shipment data and configured factors; distance is the persisted route distance, not live routing data.
| Option | Mode | Estimated CO₂e (kg) | vs Recommended |
|---|---|---|---|
| OPT-000016 | Air | 431.98 | — |
| OPT-000017 | Road | 72 | Lower |
Methodology: Estimated transport emissions = shipment tonnes × route kilometres × configured mode factor. Factors are prototype assumptions, not measured data.
Current state: Awaiting execution
Recovery action ACT-000005 has been approved and is ready for execution.